What Is a Temporary Power Pole?
It is a freestanding pole, usually mounted on a treated post or skid base, carrying a meter socket, breaker panel and outlets so a job site can run power before the building has permanent service. Electricians sometimes call it a "temp pole" or spider box on wheels for smaller setups. On most residential builds a 100 amp pole handles it; commercial sites and anything running welders or multiple trades at once usually calls for the 200 amp temporary power pole. Allentown Porta Pros delivers the pole itself and coordinates timing around your other construction site services, but the physical hookup to the grid always runs through a licensed electrician and the utility. If you are staging a renovation, this pairs naturally with a home renovation porta potty order since both go in during the same site-prep window. Ground fault protection on any circuits run off the pole falls under OSHA 1926.404(b)(1)(ii), which is worth mentioning to whoever wires it.
Temporary Power Pole Installation Cost and Requirements
Pricing varies by amperage, distance from the transformer, and whether trenching is needed, so get a site-specific quote through request a quote rather than guessing off a flat number. What stays consistent is the sequence: the pole gets set, the electrician makes the connections, then the utility inspects and energizes it. Requirements differ by jurisdiction, and permit specifics for Allentown are not something we will guess at here, so confirming with the city before you schedule delivery saves a redo. The same is true for dumpster permit requirements and porta potty permit requirements if those are landing on the same site. While you are lining up logistics, most job sites also need a 10 yard dumpster rental or larger, plus temporary fence rental around the pole and panel for safety. Illumination around the equipment matters too; OSHA 1926.56(a) sets minimum lighting intensities for construction areas, which is one reason contractors add a light tower rental near the pole for night work.

Where Should a Temporary Power Pole Go on a Construction Site?
Placement depends on where the utility transformer sits, how close the trades need power, and keeping clear paths for equipment. A common layout: pole near the site entrance, panel facing the access road, and at least 60 feet of straight clearance kept open behind it if a roll-off dumpster rental truck needs to back in nearby. Housekeeping around the pole matters under OSHA 1926.25, which requires scrap and debris cleared from work areas, so keep the footprint tidy. Most Allentown contractors set the pole, portable restrooms, and temporary fence rental or chain link temporary fence panels in the same staging zone near the entrance, which also simplifies deliveries from crews working out of Bethlehem, 7.3 miles east, or South Whitehall, 5.5 miles northwest.
How long does a temporary power pole installation take?
Once the electrician and utility are scheduled, physical installation is usually a matter of hours; the wait is almost always on utility inspection and energizing, not the pole itself. Book it early in your construction site services timeline so it is not the thing holding up your start date.
Do I need a permit for a temporary power pole in Allentown?
Likely yes, but permit rules vary and are not something to guess at. Confirm directly with the City of Allentown before scheduling. See porta potty permit requirements for how we handle a similar situation on the sanitation side.
What size temporary power pole do I need?
Depends on load. Small residential jobs often run fine on 100 amp service; sites running multiple trades, welders or larger equipment usually spec a 200 amp temporary power pole. An electrician can size it against your actual equipment list.
Can Allentown Porta Pros deliver a power pole with my other site rentals?
Yes. We coordinate timing so the pole, storage container rental, and portable restroom rental all land together, which keeps your Allentown site opening on schedule instead of staggered across separate trips.
Does the temporary power pole include the electrical hookup?
No. We deliver the pole; connecting it to the grid and pulling permits is on a licensed electrician and the utility. It is similar to how a septic pumping service handles the tank but not the plumbing behind it.

Next step
Get a delivery date
Tell us the address, the dates and the headcount. We size the order and confirm the route.